kumyu.日本語 ↗

LEARNING PATH

POWER & COOLING

Trace electricity, time to power, cooling, and capital intensity.

2026-10-04textbook
POWER & COOLING · Business and infrastructure

From chip to grid: map the power chain before choosing an AI-data-center thesis

A practical map of the electrical, thermal, contractual, and reliability boundaries between a GPU and a power plant.

8 min↗
2026-10-04textbook
POWER & COOLING · Business and infrastructure

Interconnection and time to power: capacity is an engineering and regulatory queue

Why a large-load request becomes studies, equipment, tariffs, construction, commissioning, and operating limits.

7 min↗
2026-10-04textbook
POWER & COOLING · Business and infrastructure

Bloom Energy solid-oxide fuel cells: mechanism, fuel boundary, and operating questions

How to evaluate an onsite solid-oxide fuel-cell system without confusing its product description with a lifecycle result.

7 min↗
2026-10-04textbook
POWER & COOLING · Business and infrastructure

Bloom Energy business and customers: distinguish a customer signal from recognized revenue

A disclosure ladder for reading customer, partnership, deployment, and revenue claims in onsite power.

6 min↗
2026-10-04textbook
POWER & COOLING · Business and infrastructure

Bloom Energy financial statements: a filing is a measurement boundary, not a valuation answer

Read income, balance sheet, cash flow, notes, concentration, and risk factors as separate evidence.

7 min↗
2026-10-04textbook
POWER & COOLING · Business and infrastructure

Bloom Energy backlog and contracts: backlog is a definition with cancellation and execution risk

How to keep commercial pipeline, binding contracts, revenue, cash, and installed capacity separate.

7 min↗
2026-10-04textbook
POWER & COOLING · Business and infrastructure

Bloom Energy cash flow and dilution: follow the funding path

Cash generation, debt, equity, and project financing answer different questions than earnings.

6 min↗
2026-10-04textbook
POWER & COOLING · Business and infrastructure

Gas supply, emissions, and permits: onsite power has external boundaries

A site checklist for fuel contracts, air permits, methane boundaries, and emissions claims.

6 min↗
2026-10-04textbook
POWER & COOLING · Business and infrastructure

Nuclear and PPA economics: a contract is not a delivered megawatt

Compare nuclear supply, PPAs, and data-center demand using delivery, risk, and accounting boundaries.

6 min↗
2026-10-04textbook
POWER & COOLING · Business and infrastructure

Transformers, switchgear, and UPS: the electrical chain behind usable compute

Map the equipment, protection, redundancy, and commissioning steps between utility service and a rack.

6 min↗
2026-10-04textbook
POWER & COOLING · Business and infrastructure

Liquid cooling and rack density: thermal design is an interface problem

Explain direct-to-chip and liquid loops through heat transfer, water boundaries, controls, and serviceability.

6 min↗
2026-10-04textbook
POWER & COOLING · Business and infrastructure

Vertiv business and valuation: link power-and-cooling demand to filed economics

Read Vertiv’s systems business, backlog, cash economics, and risks without turning demand growth into a price target.

6 min↗